Field guide · BOQ preparation

How to prepare a bill of quantities from drawings

A bill of quantities is not produced by measuring alone. It is a controlled path from project information to auditable descriptions, quantities and prices.

9-step workflowGlobal methodProfessional review required
01

Fix the information set

List every drawing, specification, revision and instruction used. Resolve obvious conflicts and record assumptions before measurement starts.

02

Choose the measurement basis

Confirm the applicable method, project conventions, units and work breakdown. Cite the official standard instead of copying protected tables into your own publication.

03

Plan the taking-off sequence

Break the project into logical elements or trades. A consistent sequence helps prevent omissions and makes checking easier.

04

Take off the dimensions

Record dimensions in an auditable order. Use timesing for repeated work, mark deductions clearly and keep drawing references beside the measurement.

05

Square and check

Calculate each dimension line, verify units and perform independent checks on high-value or repeated quantities.

06

Abstract similar work

Collect quantities with the same description, unit and specification. Do not merge items whose pricing assumptions differ materially.

07

Write measurable descriptions

Describe what is being measured, its material or workmanship characteristics, location and any information required by the applicable method.

08

Bill and price

Transfer quantities into the BOQ structure, build or select reviewed unit rates, then state preliminaries, allowances and commercial mark-ups transparently.

09

Run final controls

Check arithmetic, omissions, drawing coverage, provisional items, page totals, references and the basis of estimate before issue.

CHECKING / OMISSIONS

Use two different checks

Coverage checking asks whether every relevant drawing area, element and specification requirement has been considered.

Quantity checking asks whether dimensions, deductions, timesing, units and arithmetic are correct. Passing one check does not mean the other has passed.

PRIMARY REFERENCES

Continue with the official material

This guide summarizes a general workflow; the governing documents remain the applicable professional and measurement publications.